The International Terminal's Baggage Makeup Area will be upgraded with a brand new, energy efficient, best-in-class conveyor system and Standard 3 technology baggage screening equipment.
Staged construction is currently underway behind the scenes in the International Terminal Baggage Area. A mezzanine level has been built above the existing baggage system to ensure continued operations and minimise the impact to passengers during construction and baggage screening equipment has been delivered.